Jeep Grand Cherokee

1993-1999 of release

Repair and car operation



Jeep Grandee Cheroki
+ Jeep Grand Cherokee brand Cars
+ Settings and routine maintenance
+ Ryadny six-cylinder engine
+ V8 Engine
+ Procedures of the general and major maintenance of the engine
+ Systems of cooling, heating and air conditioning
- Power supply system and production of the fulfilled gases
   General information
   Procedure of dumping of pressure of fuel
   Check of pressure of fuel and functioning of the fuel pump
   Removal and installation of a fuel tank
   Cleaning and repair of a fuel tank - the general information
   Repair and replacement of fuel lines
   Removal and installation of the fuel pump
   Check of serviceability and replacement of the block of the fuel level sensor
   Removal and installation of assembly of an air purifier
   Replacement of a cable of gas
   System of injection of fuel - the general information
   Check of serviceability of system of injection of fuel
   Serviceability check, removal and installation of the case of a throttle
   Check of serviceability and replacement of a regulator of pressure of fuel
   Serviceability check, removal and installation of injectors of fuel
   Check of functioning and replacement of components of system of stabilization of turns of idling (IAC)
   Service of system of production of the fulfilled gases - the general information
+ System of electric equipment of the engine
+ Systems of decrease in toxicity of the fulfilled gases and engine management
+ Manual box of gear shifting
+ Automatic transmission
+ Transfer case
+ Coupling and transmission line
+ Brake system
+ Suspension bracket and steering
+ Body
+ System of onboard electric equipment
+ Governing bodies and operation receptions


0ea6cc78 0ea6cc78

Serviceability check, removal and installation of the case of a throttle

Check

 PERFORMANCE ORDER

  1. On the top part of the case of a throttle the vacuum hose which goes to the sensor of absolute pressure in the pipeline (MAR) (only models with engines in volume of 4.0 l) is fixed. Disconnect a hose from the case of a throttle and instead of it connect the vacuum gage.
  1. Disconnect from the throttle case a vacuum hose of the MAR sensor and instead of it connect the vacuum gage (only for engines in volume of 4.0 l).
  1. Start the engine and warm up it to normal working temperature (the fan of system of cooling should be started at least twice). The vacuum gage should not fix depression - make sure of it.
  2. Slightly slightly open a butterfly valve, having exceeded single turns of the engine and make sure available depression on the vacuum gage. If depression is not fixed, check passableness of the union. In case of need clean it by means of a cleaner of carburetors.
  3. Stop the engine and make sure of smoothness of a course of a cable of gas and a butterfly valve.
  4. If there are obvious signs of jamming, check a cable and a zaslonka axis on existence on a bottom шлама and other deposits.
  5. In case of detection of deposits, try to remove them by means of a cleaner of carburetors or other suitable solvent.
  6. If cleaning does not lead to problem elimination, replace the block of the case of a throttle.

Removal and installation

Before starting performance of procedure wait complete cooling of the engine.


 PERFORMANCE ORDER

  1. Disconnect a negative wire from the battery.
  2. Remove the air sleeve connected to assembly of an air purifier and the case of a throttle.
  3. Disunite the electric socket of the sensor of provision of a zaslonka (TPS) on the throttle case. Mark and disconnect from the throttle case vacuum hoses.
  4. Disconnect a gas cable (The section Replacement of a cable of gas) and if it is provided, a transmission TV cable (Head Automatic transmission).
  5. Disconnect from the throttle case hoses of system of cooling. To Zakuporta of the line in order to avoid cooler losses.
  6. Give four nuts and remove laying of the case of a throttle. Remove from interfaced surfaces of the case of a throttle and the inlet pipeline all traces of a material of old laying.
  1. Give four nuts (arrows) and separate the throttle case from the inlet pipeline (the engine in volume of 5.2 l is shown).
  1. Installation make upside-down. Do not forget to replace laying. Make adjustment of a cable of gas and if that is provided, a TV cable (Head Automatic transmission). Check cooler level, in case of need make having added (Head of Control and routine maintenance).