Jeep Grand Cherokee

1993-1999 of release

Repair and car operation



Jeep Grandee Cheroki
+ Jeep Grand Cherokee brand Cars
+ Settings and routine maintenance
+ Ryadny six-cylinder engine
+ V8 Engine
+ Procedures of the general and major maintenance of the engine
- Systems of cooling, heating and air conditioning
   General information
   Antifreeze - the general information
   Check of functioning and thermostat replacement
   Check of serviceability and replacement of the fan of system of cooling and coupling of its coupling
   Check of functioning and replacement of the block of the sensor of temperature of a cooler
   Removal and installation of a radiator and broad tank of system of cooling
   Check of functioning of the water pump
   Removal and installation of the water pump
   Check of serviceability of an electric contour and replacement of components of the motor of the fan of a heater and air conditioner
   Removal and installation of the block of the fan of a heater
   Removal and installation of assembly of management by a heater and air conditioner
   Removal and installation of the heat exchanger of a heater
   Check of serviceability and service of systems of heating and air conditioning
   Diagnostics of system of automatic control in temperature (automatic telephone exchange) without its removal from the car
   Removal and installation of the accumulator (store) of central air of air
   Removal and installation of the compressor of central air of air
   Removal and installation of the condenser of central air of air
   Removal and installation of a tube of the calibrated jet
   Removal and installation of the evaporator of central air
+ the Power supply system and production of the fulfilled gases
+ System of electric equipment of the engine
+ Systems of decrease in toxicity of the fulfilled gases and engine management
+ Manual box of gear shifting
+ Automatic transmission
+ Transfer case
+ Coupling and transmission line
+ Brake system
+ Suspension bracket and steering
+ Body
+ System of onboard electric equipment
+ Governing bodies and operation receptions


0ea6cc78 0ea6cc78

Removal and installation of the accumulator (store) of central air of air

Air central air constantly is under pressure. Do not weaken shtutserny connections of lines and do not disconnect systems any of components before carrying out its discharge. The coolant should be extorted from system in special compensatory and regenerative ERA-blok at station of dealer office or in a specialized workshop of car-care center. At a rassoyedineniye of lines of system surely put on goggles!


 PERFORMANCE ORDER

  1. Make a discharge of central air of air (see the prevention above).
  2. Disconnect a negative wire from the battery.
  3. Disunite the electric socket on the sensor switch the pressure switch in the top part of the accumulator which is located from the passenger party of the car, near a wheel arch.
  1. Disconnect the sensor switch of pressure of turning on of the coupling of coupling from the accumulator.
  1. Disconnect the absorption line from the compressor, previously отболтив it.

It is not necessary to disconnect refrigerator lines from the accumulator - they should be replaced together with the accumulator.

  1. To Zakuporta open unions in order to avoid hit in moisture and dirt system.
  2. By means of the special tool (see. The section Removal and installation of the heat exchanger of a heater) disconnect the line from the accumulator where it passes through a partition of an impellent compartment to the evaporator. Weaken a coupling bolt of a fixing arm and remove the accumulator together with the lines connected to it.
  3. If the accumulator is replaced, remove with old Schröder's valve (under the pressure sensor switch) and pour out oil in measured capacity, having remembered its quantity. Add the same amount of oil (согласующееся on type with R-134a), plus of one more ounce (28.35 g) in the new accumulator.
  4. Installation make upside-down.

At assembly in each podpruzhinenny joint it should be established on the sealing ring suitable for the use in systems, filled with R-134a type oil.

  1. Drive away the car in the same workshop where central air discharge was made. Make here its oporozhneniye, a charging and check on leaks.