Jeep Grand Cherokee

1993-1999 of release

Repair and car operation



Jeep Grandee Cheroki
+ Jeep Grand Cherokee brand Cars
+ Settings and routine maintenance
+ Ryadny six-cylinder engine
+ V8 Engine
+ Procedures of the general and major maintenance of the engine
- Systems of cooling, heating and air conditioning
   General information
   Antifreeze - the general information
   Check of functioning and thermostat replacement
   Check of serviceability and replacement of the fan of system of cooling and coupling of its coupling
   Check of functioning and replacement of the block of the sensor of temperature of a cooler
   Removal and installation of a radiator and broad tank of system of cooling
   Check of functioning of the water pump
   Removal and installation of the water pump
   Check of serviceability of an electric contour and replacement of components of the motor of the fan of a heater and air conditioner
   Removal and installation of the block of the fan of a heater
   Removal and installation of assembly of management by a heater and air conditioner
   Removal and installation of the heat exchanger of a heater
   Check of serviceability and service of systems of heating and air conditioning
   Diagnostics of system of automatic control in temperature (automatic telephone exchange) without its removal from the car
   Removal and installation of the accumulator (store) of central air of air
   Removal and installation of the compressor of central air of air
   Removal and installation of the condenser of central air of air
   Removal and installation of a tube of the calibrated jet
   Removal and installation of the evaporator of central air
+ the Power supply system and production of the fulfilled gases
+ System of electric equipment of the engine
+ Systems of decrease in toxicity of the fulfilled gases and engine management
+ Manual box of gear shifting
+ Automatic transmission
+ Transfer case
+ Coupling and transmission line
+ Brake system
+ Suspension bracket and steering
+ Body
+ System of onboard electric equipment
+ Governing bodies and operation receptions


0ea6cc78 0ea6cc78

Removal and installation of assembly of management by a heater and air conditioner

See the prevention at the beginning of the Section Removal and installation of the block of the fan of a heater.

 PERFORMANCE ORDER

  1. Disconnect a negative wire from the battery.
  2. Give six screws and remove facing of the central part of the dashboard.

For ensuring access to two bottom screws remove an ashtray.


  1. For removal of facing of the central part of the dashboard take an ashtray and give six screws.
  1. Give four screws of fastening of the control panel a heater and the air conditioner.
  1. Give screws of fastening of the control panel a heater and the air conditioner.
  1. Take the control panel from the nest, having pulled it forward, disunite electric sockets shtutserny connections of vacuum lines.
  1. Take assembly of management by a heater and the air conditioner from the nest and disunite on its back party electric and vacuum sockets.

Scheme of connection of assembly of the control panel heater and air conditioner

  1. Socket of management in temperature
  2. Socket of a speed control of rotation of the fan
  1. Installation make upside-down.

Checks of vacuum lines of the control panel

Necessary for functioning of a control system by climate depression moves on the control panel on the line connected to the inlet pipeline. The control valve is switched on in this line.

 PERFORMANCE ORDER

  1. Having switched off the engine, take from the vacuum line going from the inlet pipeline the control valve (remember its orientation in the line) and by means of the manual vacuum pump put to the valve from its party turned to the engine depression by depth of 203 mm of mercury. The valve should "pass" depression.
  1. By means of the manual vacuum pump check the unilateral control valve (shooter) in the vacuum line of the control panel a heater and the air conditioner.
  1. Create depression from the party of the valve turned to the control panel. Now the valve should appear is locked. If this condition is not carried out, replace the control valve.
  2. Establish the control valve to the vacuum line (correctly сориентировав it) and connect a hose to the inlet pipeline.
  3. At the control panel taken from the nest and the disunited vacuum plait (see an illustration) serially create depression by depth of 203 mm of mercury. on each of seven unions of the socket.
  1. Create depression by depth of 203 mm of mercury. serially on each of seven unions of the socket of a vacuum plait.
  1. If any of contours does not hold depression, survey the line of this contour in search of a source of "leak" and make necessary repair.

Components of a vacuum contour.