- Procedures of the general and major maintenance of the engine
   General information
   Major maintenance of the engine - the general information
   Check of kompressionny pressure in cylinders
   The diagnostic checks made by means of the vacuum gage
   Methods of removal of the engine and necessary precautionary measures
   Removal and engine installation
   Options of restoration of the engine
   Order of dismantling of the engine
   Dismantling of a head of cylinders
   Cleaning and check of a condition of a head of cylinders
   Service of valves
   Assembly of a head of cylinders
   Removal of shatunno-piston assemblies
   Removal of a cranked shaft
   Cleaning of the block of the engine
   Check of a condition of the block of the engine
   Honingovaniye of cylinders
   Check of a condition of shatunno-piston assemblies
   Check of a condition of a cranked shaft
   Check of a condition of radical and shatunny bearings
   Engine assembly order after completion of its major maintenance
   Installation of a cranked shaft and check of gaps of radical bearings
   Installation of piston rings
   Installation of shatunno-piston assemblies and check of gaps in shatunny bearings
   The first start of the engine after major maintenance
+ Systems of cooling, heating and air conditioning
+ the Power supply system and production of the fulfilled gases
+ System of electric equipment of the engine
+ Systems of decrease in toxicity of the fulfilled gases and engine management
+ Manual box of gear shifting
+ Automatic transmission
+ Transfer case
+ Coupling and transmission line
+ Brake system
+ Suspension bracket and steering
+ Body
+ System of onboard electric equipment
+ Governing bodies and operation receptions


0ea6cc78 0ea6cc78

Order of dismantling of the engine

It is simplest to make engine dismantling at the portable assembly stand. Such stand usually cheaply can be rented in a workshop of car-care center or special point of hire. Before establishing the engine on the stand from it it is necessary to remove a flywheel / a driving disk.

If possibility to use the stand is absent, it is possible to make engine dismantling after installation it on wooden blocks directly on a floor of a working platform. Observe extreme care not to overturn the engine on a floor during such dismantling.

If you decided to get and establish the restored engine, first of all it is necessary to remove with old all hinged units and auxiliaries - they should be then are transferred on the new block - as though you were going to start major maintenance of the old engine. Here enter:

  • The generator with arms
  • Components of systems of decrease in toxicity of the fulfilled gases
  • Distributor, candle wires and spark plugs
  • Thermostat and casing cover
  • Water pump
  • Components of system of injection of fuel
  • Inlet pipeline and final collector (ы)
  • Oil filter
  • Engine support
  • Assembly of coupling and flywheel / driving disk

At removal from the engine of hinged units and external components pay close attention to details of their installation which can appear useful and important at their transfer on new / the restored block. Remember the adjusting provision of laying, epiploons, remote plugs, pins, arms, washers, bolts and other fine details.

If you are going to make installation of the reduced set of the block (see. The section Options of restoration of the engine), should be removed from the old engine a head (and) cylinders, the pallet of a case and the oil pump.

If carrying out complete major maintenance is planned, the engine should be disassembled and from it all internal components are taken. Adhere to the following order of removal of internal components of the engine:

  • Cover (and) heads (ok) cylinders
  • Inlet pipeline and final collector (ы)
  • Yokes and bars of pushers
  • Hydraulic pushers of valves
  • Head (and) cylinders
  • Cover of a drive of the gas-distributing mechanism (chain)
  • Distributive chain with asterisks
  • Camshaft
  • Case pallet
  • Oil pump
  • Shatunno-porshnevye groups
  • Cranked shaft and radical bearings

Before the beginning of dismantling of the engine and performance of procedures of its major maintenance make sure available listed below components (see also lists of tools provided in the Section the Assembly order of the engine after completion of its major maintenance):

  • Standard set of the metalwork tool
  • Set of small cardboard or plastic boxes for storage of components
  • Prokladochny scraper
  • Vertical drill for removal of step wear of the top part of cylinders
  • Stripper of a damper of krutilny fluctuations
  • Micrometers
  • Telescopic nutromer
  • Tsiferblatny measuring instrument of plunzherny type
  • The tool for compression of klapanny springs
  • Hon for processing of mirrors of cylinders
  • The tool for pro-cleaning of flutes of piston rings
  • Electrodrill
  • Set lerok and taps
  • Wire brushes
  • Brushes (ершики) for pro-cleaning of oil galleries
  • Solvent