   General information
   The repair procedures, which performance does not demand engine extraction from the car
   Reduction in position VMT of the piston of the first cylinder
   Removal and installation of covers of heads of cylinders
   Removal, check of a condition and installation of yokes and bars of pushers
   Replacement of klapanny springs, their plates and maslootrazhatelny caps
   Removal and installation of the inlet pipeline
   Removal and installation of final collectors
   Removal and installation of heads of cylinders
   Replacement of a forward epiploon of a cranked shaft
   Removal, check of a condition and installation of a cover of the distributive chain, chain and its asterisks
   Removal, check of a condition and installation of a camshaft and hydraulic pushers
   Removal and installation of the pallet of a case
   Removal, check of a condition and installation of the oil pump
   Removal and flywheel installation / driving disk
   Replacement of a back radical epiploon
   Check of a condition and replacement of rubber pillows of support of the engine
+ Procedures of the general and major maintenance of the engine
+ Systems of cooling, heating and air conditioning
+ the Power supply system and production of the fulfilled gases
+ System of electric equipment of the engine
+ Systems of decrease in toxicity of the fulfilled gases and engine management
+ Manual box of gear shifting
+ Automatic transmission
+ Transfer case
+ Coupling and transmission line
+ Brake system
+ Suspension bracket and steering
+ Body
+ System of onboard electric equipment
+ Governing bodies and operation receptions


0ea6cc78 0ea6cc78

Removal and installation of final collectors

Removal

Before starting performance of procedure let's to the engine cool down completely.


 PERFORMANCE ORDER

  1. Disconnect a negative wire from the battery.
  2. Disconnect wires from spark plugs and remove candles (Head of Control and routine maintenance).
  3. Give fixing nuts and remove thermofilters of final collectors.
  1. Remove the thermofilter of a final collector.
  1. Disconnect EGR tube from the inlet pipeline.
  2. Against the stop cock the parking brake and block (wedges) back wheels. To Poddomkratta a car front also establish it on props.
  3. Disconnect a reception pipe of system of production of the fulfilled gases from a final branch pipe of a final collector.

For an otdavaniye of the "become attached" bolts previously moisten them with getting oil.

  1. On a collector established from the passenger party of the car give bolts of fastening of a tube of EGR and lift the receiver.
  1. Give two bolts (arrow) of fastening of a tube of EGR to the final collector established from the passenger party of the engine.
  1. First of all weaken external fixture, then central and separate a collector from a head. The part of fixture of final collectors represents hairpins therefore previously take care of marking of an arrangement of fixture that at assembly of a hairpin could be established in the correct order. Besides, pay attention that long remote washers are put on the hairpins used for fastening of thermofilters (between hairpins and screens), keep washers and note places of their installation.
  1. Note the provision of hairpins and remote washers, then remove a collector.

Installation

 PERFORMANCE ORDER

  1. Installation make upside-down. Smooth out interfaced surfaces of a collector and a head. Remove all traces of a material of old laying and corrosion from a flange of a tube of EGR and a surface of the collector established from the passenger party of the engine interfaced to it. Surely replace laying between a flange of a tube and a collector.
  2. Establish fixture and tighten it with demanded effort. Move from the collector center outside, achieving demanded effort of a tightening in three stages.
  3. Carving of bolts of fastening to a collector of a reception pipe of system of production of the fulfilled gases grease previously with anti-taking hermetic, then strongly tighten them.