Jeep Grand Cherokee

1993-1999 of release

Repair and car operation



Jeep Grandee Cheroki
+ Jeep Grand Cherokee brand Cars
+ Settings and routine maintenance
+ Ryadny six-cylinder engine
+ V8 Engine
+ Procedures of the general and major maintenance of the engine
+ Systems of cooling, heating and air conditioning
+ the Power supply system and production of the fulfilled gases
+ System of electric equipment of the engine
+ Systems of decrease in toxicity of the fulfilled gases and engine management
+ Manual box of gear shifting
+ Automatic transmission
+ Transfer case
+ Coupling and transmission line
+ Brake system
- Suspension bracket and steering
   General information
   Removal and installation of the forward stabilizer of cross-section stability and its plugs
   Removal and installation of forward shock-absorbers
   Removal and installation of a cross-section jet bar of a forward suspension bracket
   Removal and installation of levers of a forward suspension bracket
   Removal and installation of screw springs of a forward suspension bracket
   Removal and installation of rotary fists
   Replacement of spherical hinges
   Removal and installation of a bar of the back stabilizer of cross-section stability
   Removal and installation of back shock-absorbers
   Removal and installation of a cross-section jet bar of a back suspension bracket
   Removal and installation of levers of a back suspension bracket
   Removal and installation of screw springs of a back suspension bracket
   Removal and installation of a steering wheel
   Condition check, removal and installation of a steering drive
   Removal and installation of the steering mechanism
   Removal and installation of the pump of system of hydrostrengthening of a wheel
   Pumping of system of hydrostrengthening of a wheel
   Wheels and tires - the general information
   Corners of installation of forward wheels - the general information
+ Body
+ System of onboard electric equipment
+ Governing bodies and operation receptions


0ea6cc78 0ea6cc78

Pumping of system of hydrostrengthening of a wheel

On termination of any procedure demanding a detachment of hydraulic lines system of hydrostrengthening of a wheel it should be pumped over for the purpose of removal from it of air and receiving adequate strengthening at turn of a steering wheel.

 PERFORMANCE ORDER

  1. Having established forward wheels in rectilinear situation, check level of liquid of system, in case of need make having added, having finished it to a mark "With" (Cold) on measuring щупе.
  2. Start the engine and leave working at turns of fast idling. Repeat check of level of liquid in system. In case of need add it to a label "With" on щупе.
  3. Pump over system, turning operated wheels from an emphasis against the stop, but without blows on course limiters. The air which has thus got to system will be expelled from it. In the course of performance of procedure watch, that its tank constantly was full.
  4. After air will be removed from system again establish wheels in rectilinear situation and, before switching off the engine, let's to it work some more minutes.
  5. Carry out trial runs, checking serviceability and noiselessness of functioning of a steering.
  6. Repeat check of level of liquid at the engine warmed up to normal working temperature - it should be in the region of a mark of "N" (Hot) on щупе. In case of need make having added (Head of Control and routine maintenance).