Jeep Grand Cherokee

1993-1999 of release

Repair and car operation



Jeep Grandee Cheroki
+ Jeep Grand Cherokee brand Cars
+ Settings and routine maintenance
+ Ryadny six-cylinder engine
+ V8 Engine
+ Procedures of the general and major maintenance of the engine
+ Systems of cooling, heating and air conditioning
+ the Power supply system and production of the fulfilled gases
+ System of electric equipment of the engine
+ Systems of decrease in toxicity of the fulfilled gases and engine management
+ Manual box of gear shifting
+ Automatic transmission
+ Transfer case
- Coupling and transmission line
   General information
   Coupling - the general description and check of serviceability of functioning
   Removal and installation of components of hydraulic system of switching off of coupling
   Removal, check of a condition and installation of components of coupling
   Removal, check of a condition and installation of the vyzhimny bearing of coupling
   Check of a condition and replacement of the directing bearing
   Driveshafts, differentials and bridges - the general information
   Check of a condition of the transmission line
   Removal and installation of driveshafts
   Replacement of kardanny hinges
   Replacement of an epiploon of a shaft of a leading gear wheel of differential
   Removal, service and installation of a nave and bearings (forward wheel)
   Removal, major maintenance and installation of a forward power shaft
   Removal and installation of assembly of the forward bridge
   Removal and installation of a back semi-axis and bearing assembly
   Removal and installation of assembly of the back bridge
+ Brake system
+ Suspension bracket and steering
+ Body
+ System of onboard electric equipment
+ Governing bodies and operation receptions


0ea6cc78 0ea6cc78

Removal and installation of assembly of the back bridge

 PERFORMANCE ORDER

  1. Weaken nuts of fastening of back wheels, поддомкратьте the car and establish it on props. Remove wheels.
  2. Prop up assembly of the back bridge by the telezhechny jack got under differential.
  3. Give the bottom nuts of fastening of shock-absorbers, compress shock-absorbers, having cleaned them from a way (Head the Suspension bracket and a steering).
  4. Disconnect the driveshaft from the holder of a crosspiece of a shaft of a leading gear wheel of differential and suspend its back part to the car bottom by means of a piece of a wire (The section Check of a condition of the transmission line).
  5. To Otboltita a bar of the stabilizer of cross-section stability from a connecting link of the stabilizer (if are provided).
  6. Disconnect cables of the parking brake from the equalizer (Head Brake system). Disconnect a rod of management of the proportsioniruyushchy valve of the sensor of height from a bridge case (only for the Comanche models).
  7. Disconnect a flexible brake hose from a tee on a case of the back bridge. To Zakuporta the end of a hose or wind it with a plastic bag for the purpose of prevention of losses of liquid and hit in dirt system.
  8. Fix screw springs safety chains in order to avoid a sletaniye of springs after bridge lowering.
  9. Lower a jack and take bridge assembly from under the car.
  10. Installation make upside-down. Take care of that nuts of U-shaped bolts and bolts of collars of the kardanny hinge were tightened with demanded effort.