Jeep Grand Cherokee

1993-1999 of release

Repair and car operation



Jeep Grandee Cheroki
+ Jeep Grand Cherokee brand Cars
+ Settings and routine maintenance
+ Ryadny six-cylinder engine
+ V8 Engine
+ Procedures of the general and major maintenance of the engine
+ Systems of cooling, heating and air conditioning
+ the Power supply system and production of the fulfilled gases
+ System of electric equipment of the engine
+ Systems of decrease in toxicity of the fulfilled gases and engine management
+ Manual box of gear shifting
+ Automatic transmission
+ Transfer case
- Coupling and transmission line
   General information
   Coupling - the general description and check of serviceability of functioning
   Removal and installation of components of hydraulic system of switching off of coupling
   Removal, check of a condition and installation of components of coupling
   Removal, check of a condition and installation of the vyzhimny bearing of coupling
   Check of a condition and replacement of the directing bearing
   Driveshafts, differentials and bridges - the general information
   Check of a condition of the transmission line
   Removal and installation of driveshafts
   Replacement of kardanny hinges
   Replacement of an epiploon of a shaft of a leading gear wheel of differential
   Removal, service and installation of a nave and bearings (forward wheel)
   Removal, major maintenance and installation of a forward power shaft
   Removal and installation of assembly of the forward bridge
   Removal and installation of a back semi-axis and bearing assembly
   Removal and installation of assembly of the back bridge
+ Brake system
+ Suspension bracket and steering
+ Body
+ System of onboard electric equipment
+ Governing bodies and operation receptions


0ea6cc78 0ea6cc78

Removal, service and installation of a nave and bearings (forward wheel)

Removal

Nave assembly with the bearing and accompanying components


This procedure is applicable only to 4WD models. On not all-wheel drive models bearings of tight type are used.


 PERFORMANCE ORDER

  1. Remove a nave cap, шплинт and a nut clamp, then give a nave nut.
  1. Before поддомкрачивать the car remove шплинт and a lock-nut, then weaken a nave nut.
  1. Weaken nuts of fastening of a forward wheel, поддомкратьте a front of the car and establish it on props. Remove a wheel.
  2. Remove a support and a disk of the brake mechanism (Head Brake system).
  3. Remove a nave nut. To Otboltita nave assembly from a rotary fist also beat out it from a nest in a fist. If shlitsa of a nave "became attached" to an axis, use a stripper.
  1. Give a forward bolt (shooter) …

… and two back bolts (arrow) of fastening of assembly of a nave to a rotary fist (12 beam head is required).

  1. Carefully bring down nave assembly from a rotary fist.

Service

The nave block with the bearing is not subject to dismantling. In case of damage or wear of a nave or the bearing all assembly is subject to replacement.

Installation

 PERFORMANCE ORDER

  1. Emery paper smooth out an opening in a rotary fist, having removed from it all traces of corrosion and dirt. Grease shlitsa driving and greasing for wheel bearings. The same greasing use for greasing of walls of an opening in a rotary fist and establish nave assembly into place. Tighten bolts of fastening of a nave to a fist with demanded effort.
  2. Establish into place a washer and a nave nut, strongly tighten a nut. Establish a disk and a support of the brake mechanism (Head Brake system), put on a wheel and lower the car on the earth. Tighten nuts of fastening of a wheel with demanded effort (Head of Control and routine maintenance).
  3. Tighten a nave nut with demanded effort, establish a clamp and new шплинт. Put on a nave cap.