Jeep Grand Cherokee

1993-1999 of release

Repair and car operation



Jeep Grandee Cheroki
+ Jeep Grand Cherokee brand Cars
+ Settings and routine maintenance
+ Ryadny six-cylinder engine
+ V8 Engine
+ Procedures of the general and major maintenance of the engine
+ Systems of cooling, heating and air conditioning
+ the Power supply system and production of the fulfilled gases
+ System of electric equipment of the engine
+ Systems of decrease in toxicity of the fulfilled gases and engine management
+ Manual box of gear shifting
- Automatic transmission
   General information
   Diagnostics of malfunctions - the general information
   Removal and installation of the lever of switching
   Check of a condition and adjustment of a cable of switching
   The description, replacement and adjustment of a cable of a drive of a butterfly valve in a mode kik-Down (TV cable)
   Serviceability check, adjustment and replacement of the sensor switch of permission of start
   Adjustment of a cable of a lay blokirator
   Check of a condition and replacement of a support of transmission
   Epiploon replacement
   Design description, removal and installation of lines and hoses of cooling of transmission
   Removal and installation of an additional cooler
   Removal and installation of automatic transmission
   Replacement of the module of management with transmission (TSM) (only for AW-4 and 42RЕ)
   Diagnostics of system of electronic control by automatic transmission
+ Transfer case
+ Coupling and transmission line
+ Brake system
+ Suspension bracket and steering
+ Body
+ System of onboard electric equipment
+ Governing bodies and operation receptions


0ea6cc78 0ea6cc78

Removal and installation of an additional cooler

Details of installation of an additional cooler (transmission 42RН and late 46RН)


 PERFORMANCE ORDER

  1. Remove a front grille (Head the Body).
  2. Remove the condenser of the conditioner of air if it disturbs performance of the forthcoming work (The head of System of cooling, heating and air conditioning).
  3. Mark okhladitelny lines for the purpose of providing a guarantee of the correct connection at assembly.
  4. Establish drain capacity under collars of hoses of a cooler.
  5. Weaken clips collars and remove hoses.
  6. Give all fixture of a cooler to a radiator and its support.

Details of installation of an additional cooler (transmission AW-4).

Details of installation of an additional cooler (transmission 42RЕ and early 46RН).
  1. Remove an additional cooler.
  2. Check cooler hoses on existence of cracks and cuts. Cut off the worn-out ends of hoses. In case of detection of defects of the central part of a hose (not on the ends) replace it.
  3. Installation make upside-down. Track reliability of a tightening of all fixture and shlangovy clips.